Greensboro closes Fairall Drive for sewer line installation
The City of Greensboro announced a two day closure of Fairall Drive between Franklin Boulevard and Chavis Street from 9 a.m. to 4 p.m. beginning Thursday November 13 through November 14 2025 to allow crews to install a sewer line for new construction. The short closure matters to residents and commuters because it could change travel patterns and access to nearby properties and the city is urging people to monitor updates on its Road Projects page.
Listen to Article
Click play to generate audio
The City of Greensboro issued a notice on November 12 2025 announcing that Fairall Drive would be closed during daytime hours to accommodate installation of a sewer line tied to new construction. The closure will run daily from 9 a.m. to 4 p.m. beginning Thursday November 13 through November 14 2025 and covers the segment between Franklin Boulevard and Chavis Street. City officials said the schedule depends on weather and materials and equipment availability, and they directed residents to the city Road Projects page for further details and lane and road closure notifications.
For local residents and commuters the immediate impact will be changes to travel routes and potential delays during the work window. Drivers who use Fairall Drive to reach Franklin Boulevard or Chavis Street should anticipate detours or temporary stoppages and plan extra time for trips. Property owners and businesses along the corridor may see altered access during the work hours. The city notice frames the closure as a necessary step to connect sewer infrastructure for new construction, a routine component of urban development and public utility management.
This type of short term closure illustrates how municipal infrastructure projects are coordinated and communicated. The city is responsible for permitting and scheduling work that balances construction needs with public convenience and safety. By publishing the notice and pointing residents to a centralized Road Projects page the municipality is using existing channels to provide transparency and to allow residents to track changes if weather or equipment availability force schedule adjustments.
The closure also highlights broader policy and civic considerations for Guilford County voters and stakeholders. Infrastructure investments such as sewer connections are part of how local governments manage growth and maintain public health standards. Residents may weigh the effectiveness of project communication and the responsiveness of city services when engaging with local officials or considering priorities in future municipal elections. The city notice invites public awareness and presents an opportunity for civic engagement through monitoring updates and contacting city offices if disruptions arise.
For those affected the most practical step is to consult the City of Greensboro Road Projects page for lane and road closure notifications and for any revisions to the posted schedule. Because the notice specifies that work depends on weather and materials and equipment availability residents should check for late changes before traveling during the specified hours.


